Serbia has announced a tender invitation for the Engineer Supervision of the Design and Build Works Contracts for Section 3 Paracin Trupale Medjurovo, aimed at improving structural stability and addressing erosion concerns in the tender area. The tender is situated in Serbia, and it represents a key infrastructure initiative designed to enhance safety and environmental resilience. The tender is scheduled to close on 24 Sep 2026, giving interested contractors ample time to review requirements and submit their bids. The official tender notice number is not specified, while the WWW Reference Number is 13012004. Eligible bidders and organizations are encouraged to access the detailed tender documents and specifications to gain comprehensive information about project scope, eligibility criteria, and submission procedures.To download the complete tender documents, bidders are required to register on the website.

Tender Details
Title Engineer Supervision of the Design and Build Works Contracts for Section 3 Paracin Trupale Medjurovo
WWT Ref No13012004
Tender No

9739-IFP-53136

Country

Serbia

Financer Name

European Investment Bank (EIB)

SummaryTenders are invited for Engineer Supervision of the Design and Build Works Contracts for Section 3 Paracin Trupale Medjurovo The Belgrade Ni Railway Modernization Project encompasses the comprehensive modernization reconstruction and upgrading of the railway line connecting Belgrade and Ni as part of Main Railway Line Belgrade Center Rasputnica G Rakovica Mladenova Lapovo Ni Pre evo state border Tabanovce The subject of this Contract is the provision of Engineer Supervision services for the design for the building permit the design for construction the as built design and the Works under the Works Contracts for Section 3 The Works for Section 3 are implemented through two Design and Build Works Contracts the first covering Subsections 3 1 Paracin Stalac 3 3 Djunis Trupale and 3 4 Trupale Medjurovo and the second covering Subsection 3 2 Stalac Djunis The Works Contract for Subsection 3 2 has been signed as Lot 2 following the termination of the Lot 1 Works Contract the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment The installation of ERTMS is planned under a third Works Contract ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract Period of implementation of tasks 48 months for the preparation and approval of designs execution and completion of construction works and 24 month period for defects notification Under this Services Contract the required services will include but are not necessarily limited to Supervision services in accordance with the relevant national legislation in particular the national Law on Planning and Construction of the Republic of Serbia as well as the latest EIB environmental and social standards and the most recent EBRD performance requirements Duties of the Engineer in accordance with the provisions of FIDIC Conditions of Contract for Design Build for Electrical and Mechanical Works and for Civil and Engineering Works Designed by the Contractor Yellow Book First Edition 1999 or equal Review and approval of designs for all components of the works for which the Contractor is responsible as well as all Contractor s documents design for building permit design for construction as built design
Deadline *
Deadline24 Sep 2026
Publishing Date *
Publishing Date17 Aug 2026
Tender Documents
Related DocumentsRelated Document
WhatsApp