World Wide Tenders
Loading Global Procurement Intelligence...
📌 Tender Notice #14099647

Dismantling of Old GRP Panel Tank and Supply Installation of New GRP Panel Tank Hot Press

United Arab Emirates has announced a tender invitation for the Dismantling of Old GRP Panel Tank and Supply Installation of New GRP Panel Tank Hot Press , aimed at improving structural stability and addressing erosion concerns in the tender area. The tender is situated in United Arab Emirates, and it represents a key infrastructure initiative designed to enhance safety and environmental resilience. The tender is scheduled to close on 19 Oct 2026, giving interested contractors ample time to review requirements and submit their bids. The official tender notice number is not specified, while the WWW Reference Number is 14099647. Eligible bidders and organizations are encouraged to access the detailed tender documents and specifications to gain comprehensive information about project scope, eligibility criteria, and submission procedures.To download the complete tender documents, bidders are required to register on the website.

Tender Details
Title Dismantling of Old GRP Panel Tank and Supply Installation of New GRP Panel Tank Hot Press
WWT Ref No14099647
Tender No

2332602461

Country

United Arab Emirates

Financer Name

Self-Funded

SummaryQuotation are invited for Dismantling of Old GRP Panel Tank and Supply Installation of New GRP Panel Tank Hot Press DISMANTLING OF OLD GRP PANEL TANK ANDSUPPLY INSTALLATION OF NEW GRP PANEL TANK HOT PRESS SIZE 6M W X 5 5 5 M L X 3M H NON L NSULATED TANK LNTERNALBRACING W 1 PARTITION INCLUDING NOZZLES MANHOLE INTERNAL EXTERNAL LADDER WATER LEVEL INDICATOR FOR EACH COM PARTMENTAND STEEL SKID WITH ASSOCIATED CIVIL HDPE PIPING WORKS WORKS AS PERATTACHED BOQ SPECIFICATIONS PLEASE CONTACT MR N OOR 04 3229439 MR MELVIN 04 3229441 FORFURTHER CLARIFICATIONS SITE VISITTECHNICAL SPECIFICATIONS OF REMOVAL AND INSTALLATION OF NEW BACKWASHWATER TANK HDPE PIPELINE WORKS1 0 INTRODUCTIONDUBAI ELECTRICITY WATER AUTHORITY DEWA OWNS AND OPERATES AL YASS ATSWRO PLANT CAPACITY OF 300 000 IGPD AS PART OF THE PREVENTIVEMAINTENANCE WORK DEWA PLANS TO REPLACE REMOVE THE DAMAGED EXISTI NG OLDBACKWASH WATER TANK AND REPLACE IT WITH THE NEW ONE WHICH INCLUDES NEWINSTALLATION OF HDPE PIPELINE FROM EXISTING PRODUCT TAN K TO THE HEADEROF BACKWASH SUCTION PUMP DEWA PROPOSED AL YASSAT ISLAND TO OUTSOURCETHE SERVICES JOBS TO A REPUTED WELL EXPERIENC ED UAE GOVERNMENTAPPROVED CONTRACTOR 2 0 SCOPE OF WORKSTHE SCOPE OF WORKS FOR REMOVAL AND INSTALLATION OF NEW BACKWASH WATERTANK H DPE PIPELINE WORKS AT AL YASSAT ISLAND ARE FOLLOWS DISMANTLING REMOVAL OF EXISTING OLD GRP BACKWASH WATER TANK CAPACITY 175M3 D IMENSION 6M W X 5 5 5 M L X 3M H SECURE ALLREMOVED PANEL BOARDS RODS ETC PLACE AT SAFETY PALLETS WITH SAFETYSTRAPS S UPPLY INSTALLATION TESTING OF THE NEW INSTALLED GRP BACKWASHWATER TANK CAPACITY 175M3 DIMENSION 6M W X 5 5 5 M L X 3M H AND INCLUDES TANK FOUNDATION REPAIRS MATERIALS INSTALLED WILL BE HIGHLYCORROSIVE RESISTANCE OF SEA WATER HIGH CONDUCTIVITY SUP PLY INSTALLATION TESTING OF THE NEW HDPE PIPELINE 3 INCHES DN80 LAYING WORKS FROM PRODUCT WATER TANK DRAIN LINE CONNECTED TOBAC KWASH PUMP SUCTION LINE HEADER DN200 WITH COMPLETE ISOLATIONVALVES BELLOWS SUPPORTS OTHERS INCLUDES LINE EXCAVATION ON BURIE DPIPELINE INTERLOCKS REMOVAL INSTALLATION AND GROUND LINE ARROWMARKINGS DISTANCE HDPE PIPELINE FROM PRODUCT WATER TANK TO BACKW ASHFEED PUMP APPROX 30MTRS 3 0 PRIOR TO SUBMISSION OF QUOTATION THE FOLLOWING SHALL BE DETERMINEDCAREFULLY THE CONTRACTOR SHAL L VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE FACILITIES COMPLEXITIES ETC BEFORE SUBMITTINGTHE QUOTATION DEWA WILL NOT ACCEPT ANY CLAIM FOR EXTRAS BEYOND THE ORDER RATES PRICES DURING AND AFTER THE EXECUTION OF WORK ORDERED THE CONT RACTOR WILL BE PROVIDED WITH THE JOB SCHEDULE PROGRAM INCOORDINATION WITH METERING EQUIPMENT DEPARTMENT THE CONTRACTOR SHOULD S UBMIT THE TIME SCHEDULE BAR CHART INDICATINGEACH ACTIVITY ON COMPLETION OF THE WORK THE INSPECTION CHECKLIST OF QUALITYPROCEDURE S WHEREVER APPLICABLE SHOULD BE FILLED IN AND SUBMITTED SITE SUPERVISION CO ORDINATION OF FIELD ACTIVITIES SUPPLY OFREQUIRED TE CHNICIANS TOOLS EQUIPMENT TACKLES ETC REQUIRED FOREXECUTION OF THE CONTRACT WORKS SHALL BE SUITABLY CONSIDERED 4 0 TAKE OVER ON COMPLETION OF ALL WORK WITHIN THE SCOPE OF THE CONTRACT FORACCEPTANCE OF COMPLETED WORK CONTRACTOR SHALL NOTIFY DEWA IN WRITING ACERTIFICATE OF COMPLETION WILL BE ISSUED BY DEWA ON FINAL INSPECTIONONLY WHEN THE CONTRACT WORK IS DEEMED TO HAVE BEEN TAKEN OVER B Y DEWAAFTER NECESSARY CONDITION MONITORING CHECKS WHEREVER WHENEVERREQUIRED 5 0 FACILITIES PROVIDED BY DEWATHE FOLLOWING FACILITIE S SHALL BE PROVIDED BY DEWA FREE OF CHARGE TOTHE CONTRACTOR LIMITED TO THE SCOPE OF WORK UNDER THIS CONTRACT ELECTRICITY AND WAT ER AT ONE CONVENIENT POINT IN THE PLANT IT ISTHE RESPONSIBILITY OF THE CONTRACTOR TO HAVE HIS OWN ARRANGEMENT INEXTENDING THE ELEC TRICITY AND WATER UTILITY TO HIS PLACES OF WORK FORANY BULK STORAGE OF WATER CONTRACTOR SHOULD MAKE HIS OWN ARRANGEMENTFOR STORAGE TANKS ETC ACCOMMODATION WILL BE PROVIDED TO CONTRACTOR S EMPLOYEES AT AL YASSATISLAND UNTIL THE COMPLETION OF WORKS AT SITE BLA NKET PILLOW WILL BEMANAGED BY THE CONTRACTOR FOOD ITEMS AND EXTRA COOKING MATERIALS WILL BE BORNE BY THECONTRACTORS TRANSPORTAT ION SHIP WILL BE PROVIDED TO CONTRACTORS FROM SHINDAGHAPORT DUBAI TO AL YASSAT FOR THE EQUIPMENT S AND MATERIALS AND FROMSILA PO RT ABU DHABI TO AL YASSAT ISLAND FOR EMPLOYEES NOTE THE CONTRACTOR HOWEVER IS REQUIRED TO FURNISH IN ADVANCE HISREQUIREMENT OF P OWER AND WATER WITH FULL JUSTIFICATION CONTRACTOR SHALLNOT WASTE OR MISUSE THE FACILITIES PROVIDED BY DEWA 6 0 WARRANTY ALL THE WO RK CARRIED OUT SHALL CARRY A WARRANTY FOR 1 YEAR ON PIPINGWORKS WHICHEVER IS EARLIER WITHOUT ANY WATER LEAKAGE FROM THE TESTING AND 10 YEARS FOR THE WATER TANK THE GUARANTEE WILL TAKE EFFECT FROM THE DATE OF TAKEOVER BY DEWA OFTHE JOB CARRIED OUT BY THE CONTRACT OR WHEN A DEFECT IS NOTICED DURING THE PERIOD OF WARRANTY THECONTRACTOR MUST RECTIFY THE DEFECT WITHIN A REASONABLE AMOUNT OF TIM EFIXED BY DEWA WITH NO CLAIM OR COMPENSATION 7 0 DOCUMENTS ON SATISFACTORY COMPLETION OF THE WORK HANDING OVER THE CONTRACTORSHOU LD SUBMIT THE FOLLOWING TO DEWA DETAILED JOB COMPLETION REPORT ON INSTALLATION OF BACKWASH WATER TANKW ITH PHOTOS EXTERNAL INTERNAL JOB COMPLETION REPORT ON PIPING WORKS MATERIALS CERTIFICATE WARRANTY CERTIFICATE Qty 1 Dismantling of Old GRP panel Tank and Supply Installation of New GRP Panel Tank Hot Press Size 6m W X 5 5 5 m L x 3m H Non lnsulated Tank lnternal bracing w 1 partition including nozzles manhole internal external ladder water level indicator for each com partment and steel skid with associated civil HDPE piping works works as per attached BOQ Specifications STANDARD TERMS CONDITIONS 1 Prices should be DDP delivery duty paid at DEWA stores 2 Quotation to be submitted only in local currency U A E Dirhams 3 DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4 No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company and your participation in DEWA tenders RFQs should not constitute a Conflict or perceived Conflict of Interest Supplier Registration https srm dewa gov ae irj portal anonymous regis
Deadline *
Deadline19 Oct 2026
Publishing Date *
Publishing Date13 Oct 2026
Tender Documents
Related Documents Login to see details
WhatsApp